Archive for the ‘Hobbs Manufacturing Co’ Tag

Homer Street – 1100 block (3)

We looked at the other side of this block of Homer Street in two earlier posts. They’re part of the historic warehouse district that has been retained and converted to retail, commercial and some residential buildings. On the west side of the street earlier development wasn’t part of the CPR’s warehouse district and was included in the Downtown South residential neighbourhood. As a result, the commercial buildings on this side of the street have almost all been redeveloped. While the CPR warehouses were almost all built in a very short period, from 1909 to 1912, this side took longer, and the buildings were more recent.

That includes these two warehouse buildings, (as well as the gas station on the corner). 1107 Homer was developed in 1928 by Hobbs Manufacturing Co. Ltd, and designed and built for $34,000 by Dominion Construction Co. Ltd. Next door the larger lot with the two storey building had its building constructed in 1926. Dominion also built this one at a cost of $25,000 for Leek & Co, who had hired McCarter and Nairne to design it.

Hobbs Manufacturing had their roots in London, Ontario. They were glass dealers, but their advertisements note that they produced leaded windows for ecclesiastical purposes, along with stained glass, memorial and portrait windows, and mirrors for both religious and residential locations. They also manufactured store fronts: “fabricated in solid rolled bronze or copper or electro plated in many pleasing colors”. Another line were glass prisms for sidewalks where the basement projected beyond the building line.

Leek and Co in 1111 Homer were already established in the area – in fact less than a block away. They were a plumbing, heating installation and engineering business, previously located in 1090 Homer across the street on the next block north. The warehouse continued as their premises until 1970, when the Leasing Department of Montreal Trust advertised its availability. Whittick Mechanical Contractors started using some of the space in the building in 1972, and it was split into multiple smaller spaces until it was redeveloped.

In the early 1950s Hobbs Glass, in 1107, sold out to Canadian Pittsburgh Industries, who continued the operations of the business until 1958, when they moved to new premises on Terminal Avenue. A year later Trev Deeley’s motorcycle business was located here. Radco Sales continued distributing Suzuki motorbikes from here in the early 1970s, and by the end of the decade this had also become multiple office spaces. Joe Wai, architect, had his office here in the late 1980s.

The site was redeveloped with condos in the mid 2000s, designed by IBI / HB. The development was not without drama; the developer, Chandler Developments, went bankrupt in 2008, leaving a receiver to finish construction. The sales pitch for the project was too good to be true ” This is Chandler Development Group at its best. The respected family firm, with more than three generations of extensive real estate experience in Vancouver and beyond” In reality Mark Chandler had been ordered to stop selling condos here because he had failed to disclose his financial liabilities, and the BC superintendent of real estate, W. Alan Clark, found the information before him raised “a serious concern and a likelihood that Chandler, acting on behalf of the developers, has sold one or more development units in the developers’ developments to more than one purchaser.” This seemed more than likely as he had done exactly the same thing on a project he developed on Richards Street. He’d been deported back to Canada after being found guilty of fraud, theft and forgery related to a development project Arizona in 2003.

This didn’t really seem to put Mr. Chandler off. He started a new company, and developed a condo project in Murrayville, in Langley. Once again, he was accused of taking substatntial deposits from two parties on 34 of the units. Despite legal proceedings to sort that out, and an unpaid tax bill to the municipality, Mr. Chandler was more concerned with other matters. He had been indicted for fraud in 2016 in Los Angeles, accepting funds from investors for an LA condo project that was more fiction than reality. In addition to soliciting cash, between 2009 and 2011 Chandler convinced victims to give him loans or obtain loans from others and give him the proceeds, and use their personally owned properties as collateral for loans he obtained, according to federal prosecutors. After 3 years fighting extradition, he was transferred to the US in 2019. He may not have helped his case by supposedly surrendering his passport, and then taking a Mexico vacation using a second passport while fighting to stay in Canada.

When the case came to court in 2021, he was obviously hoping that the two years he had been held in the Metropolitan Detention Centre in Los Angeles, (where he caught COVID), and the fact that he pled guilty (to a single wire fraud charge) would help. The prosecution was seeking 51 months in prison, while his lawyers suggested two years was more appropriate. Judge Percy Anderson disagreed, and handing down a six-year sentence calling Chandler “a financial predator,”. Chandler, who used the $1.7m he obtained to buy himself a Mercedes-Benz, chartering a private yacht, luxury purchases and high-end dining, and vacations in Hawaii and Las Vegas, was also ordered to pay $1.7m back, and will have a 3-year supervised release once his sentence is served.

Image source: City of Vancouver Archives CVA 779-E08.21

1241

Advertisement